Lab 4 โ€” Implementation (Five Iterations)

Weeks 6โ€“16

Overview

Lab 4 is the longest lab โ€” spanning five sub-parts (4.0 through 4.5) that correspond to the implementation iterations of your project. Each sub-lab builds on the previous one.

Lab 4.0 โ€” Project Scaffolding (Points: 50)

"Sprint 0" โ€” establish infrastructure, action plan, and blueprints.

Infrastructure Setup (DevOps): - [ ] Create a private GitHub repository from the template - [ ] Invite team members, mentors, and TAs as collaborators - [ ] Enable Discussions, Projects, and Wikis on the repo

Action Plan (Project Management): - [ ] Set up Project Board with appropriate columns - [ ] Create milestones for all 5 iterations - [ ] Convert requirements into issues with acceptance criteria - [ ] Prioritize and assign issues to iterations

Blueprints (Design/UX): - [ ] Wireframes for all core screens - [ ] High-fidelity mockups (finalized from Lab 3 feedback) - [ ] Design system / style guide decisions

Lab 4.1 โ€” Iteration 1 (Points: TBD)

First working increment. Focus on: - Core feature vertical slice - CI pipeline green - Basic tests passing - First release tag

Lab 4.2 โ€” Iteration 2 (Points: TBD)

Incremental delivery: - Additional features per roadmap - ADR updates for design decisions made - Status report

Lab 4.3 โ€” Iteration 3 (Points: TBD)

Mid-course refinement: - Feature completion toward MVP - Testing expansion - Performance / UX check

Lab 4.4 โ€” Iteration 4 (Points: TBD)

Hardening: - Edge case coverage - Error handling - Documentation updates

Lab 4.5 โ€” Iteration 5 (Points: TBD)

Final polish: - Release candidate - Final testing pass - Handoff documentation

๐Ÿงช Research connection: The Lab 4.0 grading pipeline uses a staged AI evaluation system (Extractor โ†’ Validator โ†’ Scorer) developed by the CSED Lab. This system processes student submissions through five phases: data ingestion, staged AI evaluation, post-hoc calibration, human-in-the-loop review, and Canvas export.

Scaffolding Requirements (from Lab 4.0)

Prerequisite: ALL team members must complete Parts 1 and 2 of the GitHub Workshop before starting Lab 4.0.

Task Points
Infrastructure Setup 5
Action Plan (Project Management) 15
Blueprints (Wireframes/Mockups) TBD

Full details: See the Lab 4.0, 4.1, 4.2, 4.3, and 4.4 PDFs on CatCourses.